Upgrades to the CVR testing network to be completed by 18/03/2027
There are some exciting changes coming to the CVR testing network!
CVR testing premises and equipment have been and are being upgraded to meet the latest statutory requirements on or before 18/03/2027. Please read our responses to frequently asked questions in relation to this upgrade below.
FAQs
You can ask at your local CVRT centre or check the CVR Test Operator Register
The CVR Test Operator Register shows all authorised CVR test operators and the status of the authorisations. If your preferred/local CVR test operator is authorised to 2034 or later there will be no impact on your CVR testing centre preferences.
Some CVR test operators are in the process of completing works during 2026. The CVR Test Operator Register is updated as soon as a CVR test operator authorisation has been renewed.
Additional information about CVR testing
An independent strategic review of the Commercial Vehicle Roadworthiness Testing regime was carried out in 2019. The findings of the review were that the current model should remain, for a further 10 years to 2034, with a series of improvements required. These improvements included the requirement to upgrade all CVR testing premises to a new higher standard.
Initially these premises upgrades were due to be completed by 18/03/2024 but this due date was extended to 18/03/2027 to provide additional time to CVR test operators due to COVID-19 and other unexpected delays.
The current definition of a drive-through in the Premises and Equipment Guidelines states: “It must be possible to drive with ease each of the vehicles or combinations of vehicles in the category to be tested from the site entrance through the test lane and to the site exit in one movement. The drive through of each test lane must be achievable in one easy forward movement with no risk posed to persons in the environs of the testing area.”
Since the 2012 Act, there have been seven Statutory Instruments that further developed the regulations around Commercial Vehicle Roadworthiness these can be found by clicking on this link - The legislation
From 19/03/2027 all authorised CVR testing centres will meet the requirements set out is SI 475 of 2022. This legislation requires CVRT centres to meet a higher standard across the network. Many CVR test operators have already invested and renewed their authorisations to 2034, others are in the process of upgrading their premises and others still have decided not to continue providing the service after 18 March 2027. Here is a link to additional relevant legislation The legislation
- premises that already meet standards to be authorised for up to 10 years,
- sufficient time for upgrading of premises that do not meet standards,
- affected CVR test operators to renew their authorisations using existing premises until 18 March 2027 and subsequently using upgraded premises which meet standards until 18 March 2034.
This approach shall give affected CVR test operators a 3-year grace period, and
These requirements have been communicated since 2004. CVR test operators have been kept informed via Circulars, Guidelines, RSA Notices, Consultation, Strategic Review, Statutory instruments, presentations at their annual conference and via one-to-one engagement by email, phone and in person.
Every affected CVR test operator has received tailored communications in relation to their own circumstances.
In addition, the table below provides a register of some significant documents which were shared in relation to these requirements over the years.
|
ID |
Date of Record |
Brief description of record |
No. of pages |
1 |
31/12/2004 |
Department of Transport Premises and Equipment Guidelines 2004 |
74 |
2 |
23/12/2005 |
Circular Letter VS 4/05 - Roadworthiness Testing - upgrading of existing facilities |
8 |
3 |
14/05/2019 |
Notice to CVR test operators and CVR testers advising of upcoming Strategic Review of Commercial Vehicle Testing |
1 |
4 |
04/07/2019 |
Notice to CVR Test operators and CVR testers inviting them to participate in consultations and surveys regarding the future of CVR testing |
2 |
5 |
11/11/2019 |
Presentation given to CVR test operators regarding the outcome of the Strategic Review of Commercial Vehicle Testing and blueprint for next CVR test operator period 18/03/2024 to 18/03/2034., |
16 |
6 |
11/11/2019 |
RSA Notice 16/2019 to CVR test operators and CVR testers which contained the presentation which had been made that morning in relation to the outcome of the Strategic Review of Commercial vehicle testing given on 11/11/19 |
18 |
7 |
04/03/2020 |
Notice to CVR test operators regarding the delay in issuing Premises and Equipment Guidelines and requesting information from them. |
4 |
8 |
16/02/2021 |
Notice to CVR test operators which shared the final report of the Strategic Review of 2019. The final report sets out details on how the review was conducted, stakeholder engagement, options considered, analysis and recommendations. |
7 |
9 |
16/02/2021 |
Final Report |
77 |
10 |
06/08/2021 |
Notice to CVR test operators regarding a further delay in issuing Premises and informing them that SI 107 of 2013 needed to be amended. |
1 |
11 |
28/11/2021 |
Notice to CVR test operators regarding Premises and Equipment Guidelines updates |
1 |
12 |
19/05/2022 |
RSA Notice 11/2022 to CVR test operators regarding authorisation renewal process and containing Annex A of Premises and Equipment Guidelines |
1 |
13 |
19/05/2022 |
Annex A of the draft PEG sets out the premises and facilities standards which will be required to be met by CVR test operators who are applying to renew their authorisations. It also sets out tolerances on dimensions which may be allowed in limited circumstances. |
4 |
14 |
10/11/2022 |
RSA Notice 16/2022 - Applications to renew a CVR test operator authorisation |
1 |
15 |
14/11/2022 |
Presentation shared with CVR test operators regarding the status of CVR test operator authorisations and the process to apply and renew CVR test operator authorisations for the ten-year period 18/03/2024 to 18/03/234 |
15 |
16 |
14/11/2022 |
RSA Notice 192022 -RSA Presentations made at SIMI-VTN conference 14-11-2022 |
1 |
17 |
29/11/2022 |
Premises and Equipment Guidelines published and shared with CVR test operators |
136 |
18 |
27/04/2023 |
Policy for the Common Expiry date of CVR test operator authorisations |
3 |
19 |
12/06/2023 |
RSA Notice 04/2023 Renewal of Authorisations 2024 |
2 |
20 |
20/11/2023 |
RSA Presentations made at SIMI-VTN conference 20/11/2023 |
1 |
21 |
28/11/2024 |
CVR test operator Authorisation Renewals presentation at SIMI-VTN conference 28/11/2024 |
16 |
22 |
29/05/2025 |
RSA Notice 11/2025 - Renewal of CVR test operator authorisation to 18/03/2034 |
2 |
23 |
24/09/2025 |
RSA Notice 15/2025 - CVR Authorisation Renewals Process - Status 2025 |
1 |
24 |
06/11/2025 |
CVR test operator Authorisation Renewals presentation at SIMI-VTN conference 28/11/2024 |
16 |
25 |
14/11/2025 |
RSA Notice 182025 -RSA Presentations made at SIMI-VTN conference 06 11 2025 |
1 |